interior design estimate calculator

The average estimate and reasonable range are calculated based on balance + construction scope + material grade (estimate based on apartments in the metropolitan area).
Example: 25 pyeong ≈ 59㎡, 33 pyeong ≈ 84㎡, 40 pyeong ≈ 109㎡.
Material grade differences are applied in multiples of 1.0× / 1.3× / 1.8× for each area.
Only checked items are added up.

estimated quote

0 won
average range
Per 3.3㎡ (pyeong)

Itemized estimates

i
This is an estimate for reference only. Actual estimates may differ by ±30 to 50% depending on the balance, structure, condition of existing finishing materials, region, and company. To compare official quotes, we recommend using a standard contract + quotes from three or more companies.
Based on unit price (average apartment in the metropolitan area)
itembasicmiddlepremiumunit
Wallpaper (silk)18,000 won25,000 won35,000 wonper ㎡
Flooring (hardwood floor)40,000 won60,000 won90,000 wonper ㎡
Stamp (water-based)12,000 won18,000 won26,000 wonper ㎡
1 bathroom (including demolition)2.5 million won4 million won7 million wonper piece
Kitchen L-shaped 4m4 million won6.5 million won12 million wonceremony
Sash (33 pyeong total)9 million won14 million won22 million wonceremony
Balcony expansion (1 side of living room)3 million won4.5 million won7 million wonPer side
Lighting Replacement (All)800,000 won1.5 million won3 million wonceremony
visit replacement300,000 won450,000 won700,000 wonper piece
Built-in closet1.2 million won1.8 million won2.8 million wonper m

May vary by ±30~50% depending on time, region, and company. This unit price is an estimate that combines apartment quotation data from the Korea Land and Housing Corporation (LH) and the Ministry of Land, Infrastructure and Transport, as well as the published average values ​​from commercial interior design platforms (Zipdoc, Today's House, etc.).

disclaimer This calculator is for general reference purposes only. Actual estimates vary greatly depending on on-site measurements, existing conditions, and changes to the structure, and we recommend comparing the standard contract (Fair Trade Commission) with estimates from three or more companies before construction.