Interior renovation, one topic at a time
Interior guide

Interior renovation, one topic at a time

A plain-language overview of finishes — flooring, wallpaper, tile, bathroom, kitchen, windows — plus a contractor guide covering firm types, quotes, contracts and defect repair. Written as practical criteria for choosing and reviewing quotes yourself, not as advertising.

As of 2026.05·Prices are market-practice references
i
The detailed material pages and linked articles are in Korean. Your browser’s built-in translation (e.g. Chrome) reads them well; prices are in KRW and reflect Korean market practice.
01

Materials & finishes

Compares visible finishes — floor, wall, tile, bathroom, kitchen, windows — and performance-critical materials. Each card shows the main types, strengths and best-fit spaces; the detailed guide continues into selection, quoting, installation and care.

Interior cost · budget by size

Interior cost · budget by size

Before picking individual finishes, get the big picture: cost share by unit size and trade, turnkey vs semi-self vs self, and the add-ons quotes often miss.

KeyKitchen, bathroom and windows are over half the budget
WatchVAT, demolition and worn-out utility replacement are easy to leave out
See the cost guide →

※ A lighting & electrical finish guide is in preparation. For now, see the “Electrical & lighting” section of the cost guide.

02

Choosing a contractor

From first search through consultation, quote, contract, construction and defect repair — in the order a consumer should check. Each step links to a detailed (Korean) article.

  1. 1. Understand firm typesGeneral / specialist / direct / platform — scope of responsibility and construction-business registration8 ways to choose an interior firm
  2. 2. How to find firmsCheck track record and portfolio; look up KISCON-registered firms8 ways to choose an interior firm
  3. 3. Prep before consultingOrganize scope, budget and material taste with photosInterior cost · budget by size
  4. 4. Compare quotesSplit into material / spec / quantity / unit price; compare 3–5 firms on identical termsHow to compare quotes properly
  5. 5. Check the contractStandard contract, staged payment (deposit/interim/balance), late-penalty clauseStandard contract & staged payment
  6. 6. Prevent extra-cost disputesState in the contract that extra work can’t be billed without written consentRelated (Korean)
  7. 7. Check during constructionPhotograph/record trades that get covered up — waterproofing, plumbing, electricalBathroom
  8. 8. Defect repair & aftercareUse trade warranty periods (papering 1yr, flooring/tile 2yr, waterproofing 3yr)Claiming defect repair & disputes

Official sources · dispute mediation

Standard contracts, dispute-application channels and registered-firm lookup.

Standard interior schedule (reference)

Based on closing day D-30
  1. D-45 – D-30Concept & budgetGather 50 photos
  2. D-30 – D-15Visit-quote 3–5 firmsQuote comparison
  3. D-15 – D-7Sign standard contract, pay depositSelection criteria
  4. D-day – +21dDemolition → carpentry → papering/paint → finishContract checklist
  5. Completion +14dDefect check → pay balancePhoto/video record
Disclaimer This guide is general information only. Material prices and labor vary widely by time, region and firm; base your final contract on an on-site quote and a standard contract.